Installed Infrastructure:
- Basic Services
- Medium and high-voltage electrical power
- Electrical Sub Station (30 MVA First Stage)
- Pressurized water line for fire fighting
- Rain collector
- LED Lighting type system
- Natural gas.
Location:
South zone - Highway Los Ramirez. km 2.5. Leon, Gto.