Installed Infrastructure:
- Pressurized fire protection system meeting the highest international standards.
- Medium and high-voltage electrical power
- Electrical substation within the park
- Natural gas
- Municipal water supply and wastewater treatment system
- Flexibility to choose the construction company of your preference without additional cost
- Feasibility for rail connection
- Perimeter wall and fencing
- 24/7 private security
- Controlled access and 24/7 CCTV system
Location:
Zona Sur Oriente Carretera a Santa Ana del Conde Km. 4 Montebello, León, Guanajuato 37680